Cell Therapy Facility Feasibility and Cleanroom Activation

Before capital is committed, CellXperience shows what a planned or existing cleanroom suite can manufacture, how much of it, at what cost and with which people. The study is built room by room from your drawings, your processes and the equipment you intend to buy, and every figure in it states where it comes from: measured by you, taken from a named published process, or assumed.

When a feasibility study pays for itself

  • You have a cleanroom suite that stands idle, or was built for another product, and you need to know what it can be used for.
  • You plan a new facility and the board, the investor or the university wants output, cost and staffing before it approves the budget.
  • You intend to run several products in one suite and need to know whether they fit together, and which resource sets the limit.
  • You have an equipment list and a layout, and nobody has checked yet whether the equipment fits the rooms.

What is delivered

Suitability of the suite

  • Each intended product against the suite: the rooms it would use, the grade each step needs, and a verdict of suitable, suitable with modification, or not suitable.
  • The modifications, graded as required, recommended or optional, each tied to the GMP clause it answers and kept to what the intended use needs.
  • A room concept with the flows of personnel, material, product and waste on one plan.

Capacity and production model

  • Each product's workflow, step by step, with the room and equipment each step occupies and for how long.
  • A resource calendar of the year, day by day: cabinet minutes against the sessions available, incubator places, downstream and freezing work, weekend work, requalification and process simulation. No day is given more work than it can hold.
  • Campaign products modelled by their phases, so that other products are scheduled into the days a campaign leaves free, as a laboratory would schedule them.
  • Batches, doses or patients a year, the resource that sets the limit, and what each option to relieve it would gain.

Cost, staff and route

  • Capital and running cost estimate as a range, with the source of each price and the lines that carry most of the cost.
  • A staffing plan built from the hours of the process, set against the posts the regulation requires.
  • A regulatory route map for each product and use, read from the published texts of the country, with the questions to put to the authority in writing.
  • A management decision package for the board or the investors.

How the study runs

1

Documents

Drawings with grades, pressures and air volumes; photographs of each room; the equipment list; a short description of each process.

2

Review

Every room, every product and every figure checked against its source, with the open points named rather than assumed.

3

Report and meeting

The findings, the model and the decisions that are yours, in one review meeting.

4

Update

When a process time, a yield or the equipment changes, the model is run again.

What the study does not cover

Engineering and construction drawings, the design of the air handling system, and quotations from vendors. Every statement about the air system is a GMP comment, and a qualified HVAC engineer confirms it before work is commissioned on it. Capacity, cost and staffing figures are planning estimates: they are replaced by your own figures from the first engineering and development runs.

Frequently Asked Questions

Can an existing cleanroom be used for cell therapy or exosome production?

Often it can, if its grades, pressures, room sizes and air system fit the process, and the modifications are usually smaller than a new build. The study shows which products fit, in which rooms and with which changes. Whether the air system performs as designed is settled by inspection and testing on site, not by the drawings.

How can capacity be estimated before any batch has been made?

From the steps of each process, the culture vessels, published yields and the minutes each open step needs in the safety cabinet. These are combined in a day by day calendar of the year, so that no day carries more work than its sessions allow. The figures are planning targets and are replaced by measured ones after the first runs.

What does a cell therapy facility cost to run?

It depends on the products, the batch size and the release testing. The estimate gives a range for each line, with its source, and names the few lines that carry most of the cost, so that the decision can rest on them.

Which permits does a new facility need?

That depends on the country and on the products: usually a manufacturing authorisation or site permit, sometimes separate permits for procuring tissue and for storage and distribution, and a route to the patient through a clinical trial or another pathway. The route map reads the published texts for your country and lists the questions to settle with the authority. It is not legal advice.

Related Services and Guides

Start with the scope

Know what your suite can do before you spend on it

Send the drawings and the products you have in mind. The first call sets the scope and the documents the study needs.