What is delivered
Specification and design
- User requirement specifications for each equipment item and each facility and computerised system: functional, performance, GMP, documentation, safety and maintenance requirements, and the vendor's factory and site acceptance and qualification obligations.
- Annex 11 and 21 CFR Part 11 requirements for every system with software, with a vendor questionnaire and an assessment checklist.
- Vendor management: compliance matrices for each technical proposal, clarification rounds, agreed documentation packages and acceptance test dates.
- GMP review of the engineering drawings against Annex 1 and the specifications, closing with the design qualification report.
The qualification document set
- IQ, OQ and, where it applies, PQ protocols with report templates for each equipment item.
- The cleanroom and utilities qualification suite: filter integrity, airflow and air change rates, pressure cascades, particle classification at rest and in operation, recovery, airflow visualisation, temperature and humidity, microbial baseline, water, gases and the monitoring system.
- Computerised system validation for each software system.
- Environmental monitoring performance qualification, disinfectant efficacy and gowning qualification.
- The traceability matrix from the specification through acceptance tests, IQ, OQ and PQ, and the final qualification summary report.
Aseptic process simulation
- Media fill design for each aseptic process, including manual and closed processes and each presentation of the product, with the interventions, worst cases and incubation and reading arrangements set out.
Oversight
- Approval of protocols and reports, deviation decisions and data review during execution.
- Interim quality assurance while your own team is being recruited: document control, deviations, CAPA and change control, review of logbooks and trending of monitoring data. Release of product for patients remains with your own qualified person or head of quality.
Who does what
CellXperience writes the protocols, reviews the data and approves the reports. The tests themselves are run on site by an accredited cleanroom testing team and a commissioning and qualification partner with calibrated instruments, recommended by CellXperience, contracted by you and supervised by CellXperience. That keeps each piece of work with the people who are equipped and accountable for it.
Frequently Asked Questions
What is the difference between design, installation, operational and performance qualification?
Design qualification shows that the design meets the user requirements. Installation qualification shows that the equipment or system is installed as specified. Operational qualification shows that it works across its intended operating ranges. Performance qualification shows that it performs reliably in use, with the real process or a representative one. Together with the user requirement specification they make up the qualification stages of section 3 of EU GMP Annex 15.
How often must a cleanroom be requalified?
EU GMP Annex 1 (2022), 4.32, sets a maximum interval of six months for Grade A and B areas and twelve months for Grade C and D, and asks for requalification also after remedial action and after significant changes. The minimum tests are particle classification, final filter integrity, airflow volume, pressure differences and air velocity, which is required for unidirectional airflow and otherwise set by the risk assessment.
How many media fills does an aseptic process need?
Under Annex 1, 9.38, an aseptic process is validated initially with at least three consecutive successful simulations covering all shifts, and revalidated normally twice a year for each process, line and shift; every operator takes part in at least one successful simulation a year. For manual operations, 9.39 asks for each operator to take part in at least three consecutive successful simulations at the start and one about every six months after that.
Can qualification documents be ready before the equipment arrives?
Yes, and they should be. Protocols written against the specifications let testing start the day the equipment is installed, and they make sure the vendor's acceptance tests produce evidence the qualification can use.
Related Services and Guides
Qualify once, and with documents that hold
Tell us what is being installed and when. The first call sets the document list and the order of work.